- Clear the interfaced surfaces of the block of cylinders and the GRM case of the sealant remains. You watch that dirt did not get to openings of the block of cylinders.
|
Carving openings of bolts of fastening of a head of cylinders have to be cleared of oil and cooling liquid. Blow openings compressed air or remove liquid by means of the screw-driver with the rags which are reeled up on it. Otherwise at a vvorachivaniye of new bolts in the block cracks can be formed, and values of effort of tightening will be distorted. |
- Clear the interfaced surface of a head of cylinders.
- Check a curvature of a head of cylinders (see the Part the General and capital repairs of the engine of the present Chapter).
|
It is not allowed to grind a head of cylinders. |
- Cut off ledges of new sealing laying of a head of cylinders (size I) on the party of the case of the GRM drive.
Places of a cut and tag of top of sealing laying of a head of cylinders
- Install asterisks of camshafts with the chain which is put on them in the GRM case.
- Apply rollers (1) of silicone sealant 2 mm thick on corners of the case of the drive of the GRM/block of cylinders.
Putting sealant (1) on a GRM drive cover joint with a head of cylinders and bolts of fastening of the case of the GRM drive
|
Apply only OPEL, ET No. 90 543 772 sealant. After putting sealant the head of cylinders and the GRM case have to be established and tightened by bolts within 10 min. |
- Establish new sealing laying of a head of cylinders so that it was not blocked any of openings. The inscription "OBEN/TOP" on laying has to be turned up. Press laying around silicone sealant.
- Insert both top bolts (2) fastenings of the case of the GRM drive at the left and on the right (address an illustration).
- Hang above sealing laying by openings at the left and on the right on bolts, and press it below, around the applied silicone sealant.
- Put two other rollers in corners of the GRM case and laying of a head of cylinders.
- Insert clamps of camshafts. If the clamp does not approach, slowly turn shaft for a hexagon.
- Install a head of cylinders on the block. At the same time you watch that the lock finger for a natyazhitel of a chain passed through an opening in the case of the GRM drive and a natyazhitel of a chain by a tension level.
- Press a head of cylinders to the GRM drive case.
- Screw 3 lower bolts of fastening of a head of cylinders to the case of the GRM drive and tighten them with effort of 8 Nanometers.
The lower bolts of fastening of a head of cylinders to the GRM drive case
- Once again easy blows of the plastic hammer correct the provision of a head of cylinders in the direction of the GRM case.
- Remove a clamp of camshafts.
- Insert new bolts of fastening of a head of cylinders and tighten them to a prileganiye to a head of cylinders. Then tighten bolts of fastening of a head of cylinders for four inclusion in the sequences with 1 on 10: at first - with effort of 25 Nanometers, and then - tighten them on a corner the 60th hail three times.
Order of tightening of bolts of fastening of a head of cylinders
- On the DOHC engine of 1.2 l tighten bolts of fastening of a head of cylinders in the sequence with 1 on 12 also for four receptions. At the same time begin tightening with the central bolt in the top number of bolts and continue, moving in the direction clockwise. Thus the bolt at the left above (a bolt (8) (on an illustration) drags on the last.
- Again give 3 lower bolts of fastening of a head of cylinders to the GRM drive case.
- Tighten at first bolts of fastening (1) of the water pump to a head of cylinders with effort of 8 Nanometers, and then bolts (2) cases of the GRM drive to a head of cylinders with effort of 8 Nanometers.
Bolts of fastening of the water pump (1) and case of the GRM (2) drive to a head of cylinders
- Establish a clamp of camshafts. If the clamp does not approach, slowly turn camshafts for a hexagon.
- Install asterisks with a chain on camshafts.
|
If the conductor of a rotor is not present the CMP sensor, establish an asterisk so that the tag put at removal coincided with the GRM case. |
- Press a CMP sensor rotor to an asterisk of the inlet camshaft and slightly fix an asterisk by a new bolt. Tighten a bolt so that the CMP sensor rotor still could rotate.
- Tighten also slightly a bolt of fastening of an asterisk of the final camshaft.
- Insert the top pro-rate and fix it with effort of 8 Nanometers.
- Take out a clamp of a natyazhitel of a chain.
- Establish the conductor (1) of a rotor of the CMP (KM-954) sensor and fix it on the GRM case. If necessary turn a CMP sensor rotor so that it was possible to establish the conductor.
Conductor of a rotor of the CMP sensor
|
If there is no conductor of a rotor of the CMP sensor, turn a rotor so that the tag put before removal coincided with a tag on a camshaft asterisk. At the same time the tag on an asterisk of the camshaft has to coincide with the GRM case. In this situation tighten a bolt of fastening of an asterisk of the camshaft. At the same time you watch that the rotor of the CMP sensor did not rotate relatively to a camshaft asterisk. |
- Tighten bolts of fastening of asterisks of camshafts with effort of 50 Nanometers and tighten bolts on a corner the 60th hail. At the same time hold the camshaft from a provorachivaniye a wrench for a hexagon.
|
Mandrels for fixing are not allowed to be applied as the tool to deduction. |
- Remove all lock mandrels and check gas distribution phases. For this purpose turn a bent shaft on 2 turns in the direction of rotation of the engine and stop in the provision of VMT of the piston of the first cylinder. If in this situation lock mandrels are inserted at the same time and without problems, adjustment of phases of distribution is executed truly.
- Tighten an opening stopper for a natyazhitel of a chain with effort of 20 Nanometers.
- Install the CMP sensor with a new sealing ring on the GRM case.
- Tighten an opening stopper for a stopper of a bent shaft with effort of 60 Nanometers.
- Put on a cooling system hose the AGR case and fix it by a collar.
- Connect sockets of the AGR valve and the sensor of temperature.
- Install on the block of cylinders the case of an oil filter with a new sealing ring and tighten its fixture with effort of 20 Nanometers. Fix on the case a cover with a new sealing ring.
- Install the top thermofilter of a final collector and tighten its fixture with effort of 8 Nanometers.
- Establish lock levels of the engine and tighten their fixture with effort of 20 Nanometers.
- At the corresponding complete set install the K/V compressor on the GRM case and the block of cylinders and tighten its fixture with effort of 20 Nanometers.
- Fix by hand the catalytic converter with new consolidation on a final collector, without tightening fastening bolts.
- Screw by hand, without tightening, bolts of fastening of the holder of the catalytic converter.
- Install the catalytic converter and tighten its fixture with effort of 35 Nanometers, and the holder's fixture - with effort of 15 Nanometers.
- At the corresponding complete set connect the socket of the K/V compressor on the holder.
- Establish the directing pipe of the probe of level of motive oil with new laying and tighten its fixture to a final collector with effort of 8 Nanometers.
- Further installation is made in the sequence, the return sequence of dismantle of components. Tighten fixture with the required effort.
- In conclusion of installation fill the cooling system, and also check and, if necessary, modify oil level in the engine. If the engine was removed owing to damage of sealing laying of a head of cylinders, replace oil and an oil filter since in motive oil there can be a cooling liquid.
|